Induction Heating Power Supply--Safety Operation Guide


1. Before starting the machine, first check whether the water, gas and electricity are connected. After connecting, the following operations can be performed;

2. The operator must prepare corresponding insulating shoes, gloves, etc.

3. The operator must have the corresponding electrical knowledge.

4. Before the equipment is overhauled, the electric switch must be pulled off to confirm that the power supply is disconnected, and then the discharge treatment is carried out, and then the overhaul card is hung up, and the overhaul is repeated.

5. Before starting the machine, first make sure that the waterway is normal and all parts of the equipment are normal before starting the machine.

6. Turn on the first gear filament first, then turn on the second gear filament after five minutes, and then send the high voltage after another five minutes.

7. Before sending high voltage, make sure that the output adjustment potentiometer is in a small position, and then send high voltage, and adjust the output voltage to the working voltage.

8. After confirming that there is a workpiece, you can press the heating button to make the equipment work, but no-load heating is not allowed.

9. If there is an abnormality in the equipment during work, the power supply must be disconnected immediately, and the reason should be checked before working again.

10. After the equipment is finished working, first disconnect the heating, then disconnect the high voltage, then turn off the filament and disconnect the power supply.

11. After the equipment stops working, wait for five minutes before disconnecting the water source.

12. During the operation of the equipment, if there is a temporary need to leave, it must be done. People leave the machine and stop it. It is not allowed. The machine is still working when there is no one.


weekly maintenance

1. When taking over the shift, check the flow of the cooling water outlet pipe of the equipment for abnormal phenomena. For equipment that uses evaporative cooling tubes, it is necessary to check whether the water level of the distilled water tank is qualified;

2. When taking over, check whether the cooling air volume of the glass shell and core column of the electronic tube and other ventilation and heat dissipation facilities are normal;

3. Check whether the contacts of each AC contactor are ablated and whether the wiring is loose;

4. Measure the insulation resistance of cooling water. The ground resistance of the anode of the water-cooled tube should be greater than 300K ohms;

5. The cooling water pipes of the electronic tube grid and the filament are mostly rubber tubes, which are easy to age and should be carefully checked. For the rubber tube that is aging and about to break, it should be updated in time;

6. Do a cleaning and dust removal on the inside of the chassis, wipe off the dust of each high-pressure porcelain bottle and insulating pillars, and pay attention to the cleaning of the dust filter on the air inlet of the fan. Prevent the air intake from being blocked and reduce the air output.


Semi-annual maintenance

1. Check whether the insulation performance of the low-voltage electric control circuit is qualified;

2. Use a megohmmeter to detect the insulation resistance of high-voltage devices such as high-voltage rectifier transformers, high-voltage cables, and high-voltage silicon stacks, and the value should meet the requirements;

3. Check the roundness of the inner tube of the water jacket of the electronic tube and the height of the positioning protrusion, so as to prevent the partial overheating of the anode caused by the deviation of the tube. And check whether there is scaling at the water jacket outlet and inlet pipe joints, and whether the anti-corrosion electrode is normal; 4. Check the set current value of each overcurrent relay;

5. For connecting conductors with high temperature during operation, such as filament lead wires, soft connecting wires for welding transformer primary coils, etc., if there is poor oxidation contact, additional treatment should be made;

7. Thoroughly clean the hidden places such as the top of the cabinet and the cable trench.


Link to this article:http://www.ovpd.cn/en/product/product20181026142.html
Previous:NO!
Next:NO!

Recommended Products

HOME About Us Product News Case Video Advantages Contact
主站蜘蛛池模板: 日韩一级片在线免费观看 | 69精品久久久久中文字幕 | 波多野结衣 | 日韩精品视频在线观看 | 国产成人精品免费 | 国产极品美乳尤物在线观看 | 日本一区视频在线观看 | 亚洲精品无码精品mv在线观看 | 精品无码黑人又粗又大又长 | 国产av天堂无码一区二区三区 | 午夜精品久久久 | 日韩亚欧美一二三四视频 | 欧美一级黄色录相 | 欧美精品一区二区在线观看 | 欧美动漫 | 国产激情片在线观看免费在线观看高清完整版 | 亚洲成人免费在线观看黄色大片 | 亚洲中文字幕在线天天更新 | 东京热无码av男人的天堂 | 激情无码一 | 国产精品户外野外 | 国产在线老师粉嫩无套流白浆 | 97人妻人人揉人人躁人人 | 精品久久国产亚洲免费观看 | 欧美精品亚洲日韩aⅴ | 欧美一区二区三区爽 | 欧美国产激情一区二区三区蜜月 | 亚洲av涩涩涩成人网站在线播放 | 亚洲日韩欧美国产精品共 | 四虎影院久久久 | 国产美女精品三级在线观看 | 成人精品一区二区三区四区 | 91久久线看在观草草青青 | 免费高清手机在线观看 | 国产在线精| 亚洲国产成在人网站天堂 | 欧美日韩国产一区二区三区地区 | 国产精品一区福利在线观看 | 亚洲欧洲成人 | 国产一区二区高清 | 亚洲永久丝袜 |