国产区精品-国产区精品高清在线观看-国产区精品系列在线不卡-国产区精品一区二区-国产区精品在线2022-国产区连接精品

Current Location:Home > Product > Steel wire annealing > Aluminum bar forging furnace

2020-07-20 17:48:44

Share
  • Share to WeChat Moments

Round steel forging diathermy equipment

  • Description

圖片012.png

Operation steps of round steel forging diathermy equipment and bar diathermy forging equipment

1) Passing water: Start the water pump and observe whether the water flow at the water outlet is normal.

2) Power on: first close the knife, then turn on the air switch at the back of the machine, and then turn on the power switch on the control board.

3) Setting: Select the operation mode (full automatic, semi-automatic, manual and foot control) according to your needs. When automatic and semi-automatic control, you need to set the heating time, holding time and cooling time (each time cannot be set to 0, otherwise it will not work properly). automatic cycle). Before using it for the first time and before you are proficient, you should use manual or foot control.

4) Startup: Before each start, the heating power potentiometer should be adjusted to the minimum as much as possible, and then slowly adjust the temperature to the required power after starting. Press the start button to start the machine, at this time the heating indicator on the panel is on, and there will be a sound of normal work and the simultaneous flashing of the work light.

5) Observation and temperature measurement: During the heating process, visual inspection is mainly used to determine when to stop heating based on experience. Inexperienced operators can use a thermostat to detect the temperature of the workpiece.

6) Stop: When the temperature reaches the requirement, press the stop button to stop heating. You can start it again after replacing the workpiece.

7) Shutdown: The machine can work continuously for 24 hours. The power switch should be turned off when not in use, and the knife or the air switch behind the machine should be turned off when not in use for a long time. When shutting down, the power should be cut off first and then the water should be cut off, so as to facilitate the heat dissipation inside the machine and the heat of the induction coil. Note: The machine should not work without load as much as possible, let alone run without load for a long time, otherwise, it will affect the performance and stability of the machine!


Maintenance of round steel forging diathermy equipment and bar diathermy forging equipment

When used in places with poor air environment, dust should be prevented from entering the inside of the machine, and water must not be splashed into the machine. To keep the cooling water clean, change it regularly. High temperature environment should maintain air circulation.

高頻10.jpg


Recommended Products

HOME About Us Product News Case Video Advantages Contact
主站蜘蛛池模板: 人妻丰满熟妇av无码区乱 | 免费高清在线影片一区 | 人人揉人人爽五月天视频 | 亚洲一区二区三区日本久久九 | 男女啪啪高潮无遮挡免费 | 成人影院www蜜桃网站 | 日韩成人av在线一区二区三区 | 亚洲一区二区天海 | 国产99精品一区二区三区免费 | 天天日天天操心 | 亚洲精品97福利 | 亚洲熟妇无码av不卡在线播放 | 精品无人区无码乱码毛片国产 | 18禁黄网站禁片免费观看下载 | 欧美色视频 | 国产中文成人精品久久久 | 国产乱人激情h在线观看 | 性色精品视频网站在线观看 | 三级欧美综合影视 | 国产午夜成人av在线播放 | 国产福利av在线播放 | 99久久国产精品一区二区 | 一级做a爰片久久毛片苍井优 | 午夜伦理yy4 | 国产成人a在线观看网站站 国产成人h片视频在线观看 | 免费av片大尺度在线观看 | 日韩精品无码专区琪琪 | 成年人午夜必备 | 国产成人h片在线观看 | 亚洲精品无码久 | 在线看欧美成人中文字幕视频 | 精品国产一区二区三区免费 | 欧美熟妇另类久久久久久多毛 | 日韩欧无码一区二区三区免费不卡 | 91制片厂果冻传媒京东影业 | 日本狂喷奶水在线播放212 | 国产精品日韩欧美一区二区三区 | 亚洲av成人无码久久精品老人 | 国产精品无码亚洲 | 无码人妻丰满熟妇区免费 | 国产成人无码久久久精品 |