国产区精品-国产区精品高清在线观看-国产区精品系列在线不卡-国产区精品一区二区-国产区精品在线2022-国产区连接精品

Current Location:Home > Product > IF induction series > Silicon controlled medium frequency forging furnace

2020-07-21 16:25:04

Share
  • Share to WeChat Moments

Infrared temperature measurement forging furnace

  • Description

Operation steps of infrared temperature measurement forging heating furnace

1) Passing water: Start the water pump and observe whether the water flow at the water outlet is normal.

2) Power on: first close the knife, then turn on the air switch at the back of the machine, and then turn on the power switch on the control board.

3) Setting: Select the operation mode (full automatic, semi-automatic, manual and foot control) according to your needs. When automatic and semi-automatic control, you need to set the heating time, holding time and cooling time (each time cannot be set to 0, otherwise it will not work properly). automatic cycle). Before using it for the first time and before you are proficient, you should use manual or foot control.

4) Startup: Before each start, the heating power potentiometer should be adjusted to the minimum as much as possible, and then slowly adjust the temperature to the required power after starting. Press the start button to start the machine, at this time the heating indicator on the panel is on, and there will be a sound of normal work and the simultaneous flashing of the work light.

5) Observation and temperature measurement: During the heating process, visual inspection is mainly used to determine when to stop heating based on experience. Inexperienced operators can use a thermostat to detect the temperature of the workpiece.

6) Stop: When the temperature reaches the requirement, press the stop button to stop heating. You can start it again after replacing the workpiece.

7) Shutdown: The machine can work continuously for 24 hours. The power switch should be turned off when not in use, and the knife or the air switch behind the machine should be turned off when not in use for a long time. When shutting down, the power should be cut off first and then the water should be cut off, so as to facilitate the heat dissipation inside the machine and the heat of the induction coil. Note: The machine should not work without load as much as possible, let alone run without load for a long time, otherwise, it will affect the performance and stability of the machine!


Maintenance of Forging Furnace with Infrared Temperature Measurement

When used in places with poor air environment, dust should be prevented from entering the inside of the machine, and water must not be splashed into the machine. To keep the cooling water clean, change it regularly. High temperature environment should maintain air circulation.

高頻10.jpg



Recommended Products

HOME About Us Product News Case Video Advantages Contact
主站蜘蛛池模板: 欧美日韩一区二区三区在线视频 | 亚洲av无码一区二区乱子伦as | 丰满肥臀大屁股熟妇激情 | 亚洲精品91福利在线观看 | 欧美一区二区在线视频 | 精品动漫中文字幕一区二区三区 | 国产自在自线精品午夜视频 | 少妇精品无码一区二区免费视频 | 久久精品国产亚洲精品 | 青檬在线电视剧在线观看 | 99久久精品国产麻豆 | 欧美一级日本一级毛网站 | 亚洲av无码专区在线观看素人 | 欧美a欧美乱码一 | 国产交换一区二区三区 | 在线看片免费不卡人成视频 | 日韩a级黄片 | 性中国熟女毛耸耸性视频 | 亚洲一区二区三区在线观看精品中文 | 国产乱人伦av在线麻豆a | 国产精品一一在线观看 | 亚洲精品无码午夜在线观看 | 四虎影视国产永久免费 | 亚洲成a人片在线观看天堂无码 | 亚洲国产精品嫩草影 | 国产猎奇不卡福利在线 | 四川丰满少妇被弄到高潮 | 欧洲mv日韩mv国产mv | 国产精品对白清晰受不了了 | 91原创国 | 91精品国产乱码在线观看 | 国产精品日产三级在线观看 | 日本高清无日本 | 中文字字幕乱码高清二本道资源站 | 91亚洲精品在线 | 国产日韩欧美一区二区久久精品 | 日本高清在线一区二区三区 | 国产精品国产三级国产普通话 | 91精品国产色综合久 | 国产又黄又湿无遮挡免费视频 | 免费av三级片片在线观看 |